This thesis work derives from the desire to apply the BIM methodology in the field of safety and management of construction sites starting from a complex case study relating to the construction of a medium-sized M2 sales structure to be allocated to a grocery supermarket.

Il presente lavoro di tesi deriva dalla volontà di applicare la metodologia BIM nell’ambito della sicurezza e della gestione dei cantieri a partire da un complesso caso di studio relativo alla costruzione di una media struttura di vendita M2 da destinare ad un supermercato di generi alimentari.

L’APPROCCIO BIM E LA GESTIONE DELLA SICUREZZA PER IL CANTIERE 4D: CONSTRUCTION SITE INFORMATION MODEL (COSIM)

ORILLO, DEBORAH
2020/2021

Abstract

This thesis work derives from the desire to apply the BIM methodology in the field of safety and management of construction sites starting from a complex case study relating to the construction of a medium-sized M2 sales structure to be allocated to a grocery supermarket.
2020
THE BIM APPROACH AND THE MANAGEMENT OF SAFETY FOR THE CONSTRUCTION SITE 4D: CONSTRUCTION SITE INFORMATION MODEL (COSIM)
Il presente lavoro di tesi deriva dalla volontà di applicare la metodologia BIM nell’ambito della sicurezza e della gestione dei cantieri a partire da un complesso caso di studio relativo alla costruzione di una media struttura di vendita M2 da destinare ad un supermercato di generi alimentari.
BIM
sicurezza
File in questo prodotto:
File Dimensione Formato  
TESI MAGISTRALE+LIBERATORIA_ORILLO DEBORAH.pdf

File consultabile da postazioni biblioteca

Dimensione 29.31 MB
Formato Adobe PDF
29.31 MB Adobe PDF

I documenti in UNITESI sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14253/68027