This thesis work derives from the desire to apply the BIM methodology in the field of safety and management of construction sites starting from a complex case study relating to the construction of a medium-sized M2 sales structure to be allocated to a grocery supermarket.
Il presente lavoro di tesi deriva dalla volontà di applicare la metodologia BIM nell’ambito della sicurezza e della gestione dei cantieri a partire da un complesso caso di studio relativo alla costruzione di una media struttura di vendita M2 da destinare ad un supermercato di generi alimentari.
L’APPROCCIO BIM E LA GESTIONE DELLA SICUREZZA PER IL CANTIERE 4D: CONSTRUCTION SITE INFORMATION MODEL (COSIM)
ORILLO, DEBORAH
2020/2021
Abstract
This thesis work derives from the desire to apply the BIM methodology in the field of safety and management of construction sites starting from a complex case study relating to the construction of a medium-sized M2 sales structure to be allocated to a grocery supermarket.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
TESI MAGISTRALE+LIBERATORIA_ORILLO DEBORAH.pdf
File consultabile da postazioni biblioteca
Dimensione
29.31 MB
Formato
Adobe PDF
|
29.31 MB | Adobe PDF |
I documenti in UNITESI sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento:
https://hdl.handle.net/20.500.14253/68027